Welcome to the official website of Dongtai Guangming Mechanical Seal Co., Ltd!

 Mechanical seal for kettle

contact us

Dongtai Guangming Mechanical Seal Co., Ltd

Contact: Manager Wang

Tel.: 0515-85424444

Mobile: 18994811884

Email: [email protected]

Fax: 0515-85420650

Address: 300m to the right of the People's Government of Wulie Town, Dongtai, Jiangsu, China

Website: willzhgo.cn

Normal operation and maintenance of mechanical seal manufacturer

Your current location: home page >> News >> common problem

Normal operation and maintenance of mechanical seal manufacturer

Date of issue: 2019-10-29 Author: Dongtai Guangming Mechanical Seal Co., Ltd Click:

Mechanical seal manufacturer Normal operation and maintenance

1. Preparations and precautions before startup

a. Comprehensively check whether the mechanical seal, accessory devices and pipeline installation are complete and meet the technical requirements.

b. Static pressure test shall be carried out before starting the mechanical seal to check whether there is leakage of the mechanical seal. If there are many leaks, find out the causes and try to eliminate them. If it is still invalid, it shall be disassembled, checked and reinstalled. The general hydrostatic test pressure is 2~3 kg/cm2.

c. Turn the gear according to the rotation direction of the pump and check whether it is light and even. If the turning gear is hard or does not move, check whether the assembly size is wrong and the installation is reasonable.

2. Installation and shutdown

a. The sealing chamber shall be kept full of liquid before starting. When transporting solidified medium, the sealing chamber shall be heated by steam to melt the medium. The turning gear must be turned before starting to prevent the soft ring from breaking due to sudden starting.

b. For the mechanical seal using the external sealing oil system of the pump, the sealing oil system shall be started first. Finally stop the oil sealing system after shutdown.

 Mechanical seal manufacturer

c. After the hot oil pump is shut down, the cooling water of the seal oil chamber and the end face seal cannot be stopped immediately. The cooling water can only be stopped when the oil temperature at the end face seal drops below 80 degrees to avoid damaging the sealing parts.

3. Operation

a. If there is slight leakage after the pump is started, observe for a period of time. If the leakage does not decrease after 4 hours of continuous operation, stop the pump for inspection.

b. The operating pressure of the pump shall be stable, and the pressure fluctuation shall not exceed 1kg/cm2.

c. During the operation of the pump, evacuation shall be avoided to avoid dry friction on the sealing surface and seal damage.

d. The sealing condition shall be checked frequently. During operation, when the leakage exceeds the standard, the heavy oil shall not be more than 5 drops/min and the light oil shall not be more than 10/min. If there is no improvement trend within 2-3 days, the pump shall be stopped and the sealing device shall be checked.

Website: //willzhgo.cn/news/459.html

key word: Price of mechanical seal , Wholesale of mechanical seals , Mechanical seal customization

Recent browsing:

Online Service
share One click sharing